G.A. Builders has tied up with Gilbert-Ash Fit Out – Belfast, Northern Ireland for a construction project inside the premises of British Embassy, Lainchaur, Kathmandu.
G.A. Builders have teamed up with UK construction firm for a project in 8 different sites to carry out structural adaptations to several buildings within the British Embassy compound. The project is designed such that it reinforces the structures in the Embassy to better withstand seismic activity. The project is part of a £1m contract with the UK Foreign and Commonwealth Office. Gilbert-Ash Fit Out and G.A. Builders have provided a retrofitting option to increase the safety of the buildings being constructed. The project started on Dec 05, 2016 Gilbert-Ash Fit Out along with the local engineering team of G.A. Builders are working tightly together to meet the current earthquake regulation.
G.A. Builders have been innovating and introducing new technologies in Nepal, including prefabricate houses, steel structure building, container building, retrofitting, and construct better housing options as per the landscape of Nepal.
Client | British Embassy, Nepal |
Location | Lainchour, Nepal |
Building Technique | Seismic Retro Fitting |
Partnership | Gilbert-Ash Fit Out – Belfast, Northern Ireland |
Engineer | Er. Birendra Khadka |
Construction Date | Dec 05, 2016 |
Construction Date | June, 2017 |
Project Cordinator | Sumit Shrestha |